One traffic sample.
Eight ways through.

Run known intersection designs together. Follow the same drivers. Measure the whole trip—including detours, second stops, and fuel.

Build a matched experiment

20 paired runs · 1-hour observation per run
Red turns, crossover coordination & model assumptions
Turns on red

Both require a full stop and a gap. Left-on-red applies only to signalized MUT/RCUT crossovers. No pedestrian conflicts or local prohibitions are modeled.

Crossover coordination

Negative starts crossover arterial green earlier. RCUT always uses signals here. Read the timing study.

Green allocation & geometry

Protected and split signals have four clearance periods; two-phase signals have two. Run the sweep workbench to compare alternative timings.

Vehicle & reproducibility

Passenger cars only. Additional parameters below include loading windows, gaps, vehicle physics and queue diagnostics.

All remaining model inputs

01 / SYNCHRONIZED REPLAY

Same clock. Same destinations.

Preparing experiment…
00:00

Animation shows the first replication; results below use every completed paired run.

● Intended left turn   ● Through   ● Right turn   Hollow ring = selected driver. Routes and point queues are schematic; card metrics are full-run means.

Center light ↔ crossover light

What the evidence says ↗

02 / FULL-TRIP RESULTS

Compare the cost of getting through.

DesignWait (s)Trip (s)Fuel / 1k trips
(US gal)
Stops / tripΔ wait vs reference
(s, 95% CI)
Exit flow
(veh/hour)

Exit flow counts all trips leaving during the observation hour, including warmup entrants. It remains an all-movement measure when “left turns only” is selected.

Fuel components / 1,000 selected tripsDriving distanceIdlingSpeed recoveryRoute distance (m)U-turn + return stops (%)Red turns / 1k trips

03 / ANNUAL COST COMPARISON

One exposure. Every selected design.

Full-trip time includes detours, queues and acceleration losses; total fuel includes each modeled restart. No component is added twice. All designs use the selected reference above and identical intended-left exposure. This does not scale these designs to all Michigan intersections.

DesignFuel + time / 1k tripsAnnual operating costΔ vs reference ± 95% seed intervalImplied external visits/yearModel flags

These are operating costs, not total social costs. Crash valuation below is separate; construction, maintenance, emissions, pedestrians and physical spillback are not priced. The original two-layout engine and this independent engine have different service rules; their outputs are not pooled.

04 / EXPERIMENT WORKBENCH

Sweep settings. Separate assumptions. Validate the result.

Open the full sweep builder ↗

49 model and valuation inputs, exact or seeded sampled grids, all eight designs, independent validation, and downloadable protocols. The earlier 1,710-setting search is retained as a preliminary timing study in the research dossier.

Crash assumptions: separate from operational rankings

This module has no calibrated crash prediction model or collision engine. Blank means unavailable, not zero risk. Enter a site-specific assumed rate to calculate exposure × rate; these expected counts do not inject incidents or change traffic. The two-layout lab retains the separate crash-process experiment.

Supply each design's overall crash severity mix below: K fatal, A serious, B minor, C possible injury, O property damage only. All five percentages must sum to 100%; blank is unknown. No type mix or Michigan-left rate is transferred to the other designs. These values never affect operating rankings or the settings search.

DesignK %A %B %C %O %Expected crashes/yearSeparate annual crash cost

National per-crash costs at maximum severity; comprehensive already includes economic costs. No occupant multiplier. Source audit · FHWA Table 1. Assumed rates must cover comparable systems, periods, definitions and unique external-trip exposure. No combined total is inferred.

Rates: crashes per million unique entering trips, covering the whole studied system. Do not transfer a junction-only rate to a crossover network without matching boundaries, period and crash definition.